Maintenance Plans

Residential Basic Maintenance Agreement

Quarterly professional inspection of your aerobic septic system.

Our technician will inspect the following quarterly:

  • Electrical circuits and control panel
  • Aerator/compressor operation and performance
  • Cleaning of aerator/compressor filter
  • Access risers checked for sealing and security
  • Condition of aerobic treatment unit
  • Clarifier check & measure scum/sludge levels
  • Pump tank & chlorination unit tested for proper operation
  • Sludge level in pump tank
  • Chlorine residual level test (if applicable)
  • Disposal unit inspection (drip systems are backwashed & filters cleaned at each visit)
  • Inspection reports submitted to the designated authority within 14 days of inspection.

Important

  • System must pass initial inspection. If the system fails, repairs must be made prior to the contract beginning.
  • If extensive repairs are required, you must either pay in full or, with approved credit, set up monthly auto-draft payments.
  • Financing is available for qualified applicants.

TER Credit Application →

Ready when you are

Ready for total peace of mind?

Call today to schedule your free inspection and get started with a maintenance plan.